The quantization rate ([Inevitability] §6) #
ReflectiveSubsystems.weighted_fiber_not_exactly_bayes shows the carrier projection is not the
identity: on a two-candidate, budget-2 instance the projected step discards an entire update the
exact replicator step would have made. This file answers the question that boundary opened — in what
sense, and how fast, does the finite fiber approach the exact Bayes run?
Main results #
bayesRun/wRun— the exact and finite replicator runs,ngenerations under a varying fitnessF : ℕ → Fin C → ℕ(one likelihood per step, as the real fiber receives).raw_wRun_eq_bayesRun/toDist_wRun_eq_bayes— the exactness horizon: while the fitness ceiling'sn-th power stays inside the budget, the finite run does not approximate the exact run, it is it, because the projection has nothing to do.wRun_ne_bayesRun_witnessshows the horizon is sharp: atW = 2the runs have already diverged by step2.l1_normalize_le— a general fact about ℚ-valued normalization, reusable outside this file: the L¹ distance between two normalized nonnegative vectors is controlled by the L¹ distance of the vectors themselves, over the second one's mass.toDist_project_close/toDist_project_rate/wGen_bayes_rate— the per-step residual rate: past the horizon, one projected generation stays withinO(C/W)of the exact Bayes posterior in total variation.
Scope #
The rate bounds one generation against the exact posterior it approximates; it does not
telescope into a bound on n generations run against n generations of Bayes, because Bayesian
update is not non-expansive in total variation. A multi-step accumulation and a sharper
miss-count-based rate (the rescale is free when candidates agree; the floor only bites on
candidates already below one quantum) are both left open.
The exactness horizon #
The exact replicator run: no carrier, no projection, weights free to grow. Step n
receives the fitness F n, so the run tracks a base trajectory feeding a different likelihood
into each generation, as the real fiber does.
Equations
- ReflectiveSubsystems.bayesRun F 0 = fun (x : Fin C) => 1
- ReflectiveSubsystems.bayesRun F n.succ = ReflectiveSubsystems.bayesStep (F n) (ReflectiveSubsystems.bayesRun F n)
Instances For
The finite run: one projected wGen generation per step, under the same varying
fitness.
Equations
- ReflectiveSubsystems.wRun W F 0 = ReflectiveSubsystems.pack W fun (x : Fin C) => 1
- ReflectiveSubsystems.wRun W F n.succ = ReflectiveSubsystems.wGen W (F n) (ReflectiveSubsystems.wRun W F n)
Instances For
The exactness horizon: while the fitness ceiling's n-th power stays inside the budget,
the finite run is not merely close to the exact one, it is equal to it — the carrier
projection has nothing to do, because the exact vector already fits. κ bounds the per-step
fitness; predFitPos uses κ = 2.
The distribution form, composed from raw_wRun_eq_bayesRun: the finite run's reading is
exactly the n-step Bayes posterior, below the horizon. Unfolding bayesRun one step at a time
via toDist_bayesStep recovers the iterated form bayesPost (⋯ bayesPost (toDist (fun _ => 1)) (F 0) ⋯) (F (n-1)) explicitly; the identity is carried once, at the level of the run, rather than
re-derived at every step.
The horizon is sharp. At budget 2 the raw finite run has already diverged from the exact
run by step 2 — one step past where raw_wRun_eq_bayesRun guarantees equality (2 ^ 1 ≤ 2 but
2 ^ 2 > 2), confirming the exponent in the horizon condition is not an artifact of the proof.
The per-step residual rate #
A general ℚ fact about normalization, mentioning nothing about fibers: the L¹ distance between two normalized nonnegative vectors is controlled by the L¹ distance of the vectors themselves, over the second one's mass. The reusable core of every projection-residual bound below.
The projection stays close to the exact ray, in total variation. No side hypothesis on the
budget: the bound is honest even when the projection has to do real work, and it degrades
gracefully as ∑ project W v shrinks. l1_normalize_le applied to the un-normalized ray
v / scaleDiv W v (whose normalization is toDist v, by ray-invariance) against the projected
vector itself.
The budget binds through the leader alone. Past the horizon (W < wMax v) the projection
does real work, and the heaviest candidate's projected weight is already at least half the budget
— stated multiplicatively to keep ℕ division out of the bound entirely.
The rate, binding once the budget is spent past the horizon. Composes
toDist_project_close (the general closeness bound) with sum_project_ge (the projected mass is
at least half the budget) to eliminate the projected mass from the denominator in favour of W
itself — the form IN-8 cites.
The composed statement against exact Bayes — IN-8's citation form: one projected
generation stays within 4C/W of the exact posterior it approximates, past the horizon.
Reconciling the rate with the exhibited annihilation #
weighted_fiber_not_exactly_bayes is not a counterexample to wGen_bayes_rate — it sits in the
regime the rate has nothing to say about. Total variation between any two readings is capped at
2 (toDist_sub_le_two, universally, no fiber structure involved), while wGen_bayes_rate's
bound 4 * C / W at the witness's own C = 2, W = 2 reads 4, already above that universal
cap. The rate only binds once it undercuts 2, i.e. once W > 2 * C: the annihilation regime is
W ≲ C and the rate bites only once W ≫ C, so the two facts occupy disjoint budgets rather than
contradicting each other.
A universal cap, no fiber structure involved: two readings never disagree by more than 2
in total variation, because each coordinate's disagreement is at most the sum of the two masses
there, and each reading's own mass sums to exactly 1.
The witness lies in the rate's own vacuity zone. At C = 2, W = 2 — exactly
weighted_fiber_not_exactly_bayes's instance — wGen_bayes_rate's bound is 4, already above
the universal cap toDist_sub_le_two puts on any total-variation discrepancy. The total discarding
of a step there is consistent with the rate precisely because the rate is silent at that budget.